The fastest message board... ever.
Home Community New to T21 Resources Chat
T21 General topic discussions.

Return to General Discussion
 
steel prices: supply increased pressure down
Posted by: wangyueyue ()
Date: December 05, 2017 08:46PM

steel prices: supply increased pressure downGuangzhou Market: After the Canton Canton market building materials prices rose and then fell, the cumulative pre-holiday still rose 10-20 yuan / ton. Is Shaoguan HPB300?6.5-10mm high line mainstream price 4090-4120 yuan / ton; Guangzhou Iron and Steel, Zhuhai, Guangdong Steel, Xiangtan Iron and Steel with the specifications line 3870-3920 yuan / ton; thread, Shaoguan HRB400E?18-25mm The mainstream price of specifications resources in 4150 yuan / ton;plate 2B finish stainless steel Plate on saleGuangzhou Iron and Steel, cold-rolled steel, Yufeng, Guangdong Iron and Steel, Hunan Iron and Steel HRB400E?18-25mm specifications price of 4000-4110 yuan / ton. Market feedback, billet prices in Tangshan during the Ching Ming holiday rose 90 yuan / ton, the post-holiday market opened sharp rise once spiral, boosting the confidence of manufacturers in Guangzhou market.Precio Estándar De La Bobina De Acero Inoxidable Laminado En Frío 310SAfter the holiday Shaoguan, Xiangtan Iron and Steel, Guangdong Iron and Steel prices rose 30 yuan / ton, merchants offer steady rise, one of the first and second-tier steel mills part of the resources higher, most of the other provinces and local private manufacturers offer most of the resources held steady. However, after the snail and the periphery of Shanghai, the market price in Beijing generally dropped back and the market turnover in Guangzhou also became fatigued again. Merchants offered barely stable prices. Inventory, this week, the total sample inventory of about 917,000 tons, an increase of 50,000 tons last week, of which 43,000 tons of rebar, wire coil rose 7,000 tons, which is the first time in nearly seven weeks inventory in Guangzhou rose.bright annealed cheap price aisi304l stainless steel tubeIt is understood that Liuzhou Iron and Steel Co., Ltd. plans to cut off the production of 6 # blast furnace for 45 days starting from the 15th and is expected to affect the hot metal 200,000 tons. The hot-rolled steel line will be discontinued on the 7th. The time for re-production is yet to be determined. At present, Orders, cold-rolled production reduced by 50%. And the thread will be opened to 6 lines, full protection of construction steel production. Guangzhou construction steel prices next week, or highs are expected to fall.DIN 316 0.7mm Stainless Steel Spring Wire

Options: ReplyQuote


Array
Sorry, only registered users may post in this forum.

Online Users

Guests: 5
Record Number of Users: 4 on January 12, 2016
Record Number of Guests: 287 on October 19, 2016
This forum powered by Phorum.